Aspan/ Land bank/ Solbacka
Planning notice 2026 Solbacka — view across lake and pasture, Lilla Ornäs
Borlänge · Lilla Ornäs 1:8 · Dalsjö

SolbackaAgrihood · 32 plots

A new rural-format residential area between lake and farmland. 32 plots with shared green space, allotment gardens and local building techniques. Long-term horizon, in dialogue with Borlänge municipality.

32Plots
2026Planning notice
2031+Horizon
1:8Lilla Ornäs
We own the land Borlänge municipality Agrihood concept
Vision

An agrihood between the Dalälven river, lake and farmland.

Solbacka sits on Lilla Ornäs 1:8 in Borlänge municipality, on the road between Borlänge and Falun. The family has owned the land for generations. The vision is an agrihood — a residential area where homes are clustered around shared green spaces, allotment gardens and natural features, rather than lined up along cul-de-sacs.

The planning notice from Borlänge municipality (2026) opens up 32 plots. The layout has been drawn from the topography, watercourses and sightlines — not from a standard template. Smaller plots gathered in clusters, with forest and pasture between them.

The project sits within the municipality's long-term expansion area. We're preparing drawings and dialogue in parallel, working toward the revision of the comprehensive plan around 2031. Survey carried out by Precision Mätteknik in 2026.

Layout

32 plots — overview drawing 1M0202.

Drawing 1M0202 · Precision Mätteknik · 2026 Open PDF in new window ↗
Drone views

14 photos. Click for full screen.

Location

Borlänge.

Map of Lilla Ornäs 1:8 — Solbacka Map of Lilla Ornäs 1:8 — detail

Drive times

  • Dalsjö5 min
  • Borlänge centre15 min
  • Falun centre20 min
  • SSAB Borlänge20 min
  • Stockholm Arlanda2 h 15 min

Nearby

  • Lake (Runn)~3 min
  • Dalälven river~5 min
  • Grocery (Dalsjö)~5 min
  • School (Dalsjö)~5 min
Process

Timeline.

2026-03-26
Positive planning notice from Borlänge municipality for 32 plots within Lilla Ornäs 1:8.
2026 H1
Survey carried out by Precision Mätteknik. Topography, watercourses and vegetation lines documented.
2026 H2
Overview drawing 1M0202 produced — 32 plots in clusters, adapted to the land and sightlines.
2027–2030
Detailed planning process. Dialogue with Borlänge municipality in parallel with the revision of the comprehensive plan.
2031+
Construction begins in step with the municipality's revised comprehensive plan. Ground and site works via Vassbo Gård's machine fleet; house construction via local teams.
House renderings

Per plot — coming.

Renderings in step with detailed planning

House types, renderings and materials per plot will be published in step with the detailed planning process 2027–2030. Register interest below and we'll be in touch when the first wave is ready to show.

Register interest — Solbacka

We keep an interest list for Solbacka. You'll be notified when the detailed plan, house types and first plots open for booking — and you're not committed to buy. For land only, or for land plus turnkey construction via Vassbo Gård's contracting arm.